中文版
    Current Location:Homepage->Standards and Reports->Standards->Others->Technical Guideline for Check and Acceptanct of Environmental Protection of Completed Projects
Technical guidelines for environmental protection in water conservancy and hydropower projects for check and accept completed project
HJ 464-2009 putting into effect as of Jul.1, 2009
Abstract:
 

This technical guideline is formulated for the purpose of implementing Environmental Impact Assessment Law of the People's Republic of China and Regulations on the Administration of Construction Project Environmental Protection, protecting the environment, and standardizing the environmental protection check and acceptance of water conservancy and hydropower projects upon their completion. This technical guideline provides the procedures and technical specifications for environmental protection check and acceptance of water conservancy and hydropower projects upon their completion. This technical guideline shall apply to the environmental protection check and acceptance of such large-scale water conservancy and hydropower projects as flood control, hydropower, irrigation, and water supply projects upon their completion. The environmental protection check and acceptance of small-scale water conservancy and hydropower projects as well as navigation and hydropower projects upon their completion may refer to this standard.


Technical guidelines for environmental protection in water conservancy and hydropower projects for check and accept completed project (HJ464-2009)

 
 
  Big Medium-sized Small 】  【Print】 【Close】  
Sponsored by MEP, Address: No.115 Xizhimennei Nanxiaojie, Beijing (100035)
Telephone Numbers for Administrative Offices